Portfolio: • Industry: ducey-corporate-tower

Heidi Lee (left) watches her husband Kenny Lee scribble a name in concrete mix during a ceremony celebrating the freshly poured 43rd story of the eco-luxury Bellevue Towers on May 14, 2008. The Lee's bought a unit on the 12th floor. A bucket of concrete mix (in photo) was brought in by a crane for a ceremonial {quote}final Pour{quote}.  Construction is scheduled to be completed in Novemeber 2008 making it the tallest peak in Bellevue. Thanks in part to the elevated grade of the building site, Bellevue Towers is now the cityís tallest peak.  (© copyright Karen Ducey)

Heidi Lee (left) watches her husband Kenny Lee scribble a name in concrete mix during a ceremony celebrating the freshly poured 43rd story of the eco-luxury Bellevue Towers on May 14, 2008. The Lee's bought a unit on the 12th floor. A bucket of concrete mix (in photo) was brought in by a crane for a ceremonial "final Pour". Construction is scheduled to be completed in Novemeber 2008 making it the tallest peak in Bellevue. Thanks in part to the elevated grade of the building site, Bellevue Towers is now the cityís tallest peak. (© copyright Karen Ducey)